Khusus Merce HDPe advelage struktureses dimungkinkeun dipasang dina persék paripis, bend bungkus, point dimana diaméter pipa atanapi perlahan sinde. Suku pamariksaan HDP Trymping tiasa memperminasi pintonan périodik, ngabersihan, sareng diropéa ngagunakeun interypines biasa didamel tina plana, ransuthes freekorin, sareng detail modeu lemput.
Ukuranna
|
CJ / T233-2006 |
|||||
|
Barang |
Spésifikasi Manhole |
Babi Pipa Keciran |
Barang |
Spésifikasi Manhole |
Babi Pipa Keciran |
|
Dimimitian dasarna |
315 |
200 |
Lempeng - ngaliwat basa |
315 |
200 |
|
225 |
225 |
||||
|
300 |
300 |
||||
|
350 |
200 |
350 |
200 |
||
|
225 |
225 |
||||
|
300 |
300 |
||||
|
450 |
200 |
450 |
200 |
||
|
225 |
225 |
||||
|
300lace |
300lace |
||||
|
300heavy |
300heavy |
||||
|
400-1 |
400-1 |
||||
|
400heavy |
400heavy |
||||
|
630 |
300 |
630 |
300 |
||
|
400 |
400 |
||||
|
500 |
500 |
||||
|
600 |
600 |
||||
|
700 |
300 |
700 |
300 |
||
|
400 |
400 |
||||
|
500 |
500 |
||||
|
600 |
600 |
||||
|
1000 cahaya - tugas |
300 |
1000 cahaya - tugas |
300 |
||
|
400 |
400 |
||||
|
500 |
500 |
||||
|
1000 beurat - |
300 |
1000 beurat - |
300 |
||
|
400 |
400 |
||||
|
500 |
500 |
||||
|
600 |
600 |
||||
|
800 |
800 |
||||
|
Baskug pas |
315 |
200 |
Dasar tee |
315 |
200 |
|
225 |
225 |
||||
|
300 |
300 |
||||
|
350 |
200 |
350 |
200 |
||
|
225 |
225 |
||||
|
300 |
300 |
||||
|
450 |
200 |
450 |
200 |
||
|
225 |
225 |
||||
|
300lace |
300lace |
||||
|
300heavy |
300heavy |
||||
|
400-1 |
400-1 |
||||
|
400heavy |
400heavy |
||||
|
630 |
300 |
630 |
300 |
||
|
400 |
400 |
||||
|
500 |
500 |
||||
|
600 |
600 |
||||
|
700 |
300 |
700 |
300 |
||
|
400 |
400 |
||||
|
500 |
500 |
||||
|
600 |
600 |
||||
|
1000 cahaya - tugas |
300 |
1000 cahaya - tugas |
300 |
||
|
400 |
400 |
||||
|
500 |
500 |
||||
|
1000 beurat - |
300 |
1000 beurat - |
300 |
||
|
400 |
400 |
||||
|
500 |
500 |
||||
|
600 |
600 |
||||
|
800 |
800 |
||||
|
Fas |
315 |
200 |
Fas |
350 |
200 |
|
225 |
225 |
||||
|
300 |
300 |
||||
|
450 |
200 |
700 |
300 |
||
|
225 |
400 |
||||
|
300 |
500 |
||||
|
400 |
600 |
||||
|
630 |
300 |
1000 beurat - |
300 |
||
|
400 |
400 |
||||
|
500 |
500 |
||||
|
600 |
600 |
||||
|
1000 cahaya - tugas |
300 |
800 |
|||
|
400 |
- |
||||
|
500 |
|||||
Spésifikasi Manhole
|
Barang |
Spésifikasi |
Satuan |
Barang |
Spésifikasi |
Satuan |
|
Cincin segel |
Φ315 |
pipah |
Konvertor konflik |
300*200*160*110 |
pipah |
|
Φ350 |
pipah |
200*160*110 |
pipah |
||
|
Φ450 |
pipah |
Inlet Gully Gully |
450*320-300 |
payun |
|
|
Φ630 |
pipah |
sisi |
|||
|
Φ700 |
pipah |
Ach ngajajar |
315*350 |
pipah |
|
|
Ring segel pérek peed |
Φ200 |
pipah |
450*630 |
pipah |
|
|
Φ300 |
pipah |
450*700 |
pipah |
||
|
Φ400 |
pipah |
Restin panutup panutup |
Φ350,30T |
pipah |
|
|
Φ500 |
pipah |
Φ500,15T |
pipah |
||
|
Φ600 |
pipah |
Φ500,30T |
pipah |
||
|
Ringler & 45 darajat |
Φ250 |
pipah |
Φ700,15T |
pipah |
|
|
Φ350 |
pipah |
Φ700,30T |
pipah |
||
|
Φ450 |
pipah |
1000 cincin segel |
Cahaya - Kahirupan Manihole |
pipah |
|
|
Φ550 |
pipah |
Beurat - kawajiban manhole |
pipah |
||
|
Φ650 |
pipah |
1000 aci reducker |
Reducer Inker |
Cahaya |
|
|
Adaptor tapered |
300*200 |
pipah |
Beurat |
||
|
400*300 |
pipah |
Reducer luar |
Cahaya |
||
|
500*400 |
pipah |
Beurat |
|||
|
600*500 |
pipah |
Konsentrasi batin |
Cahaya |
||
|
45 siku gelar |
Φ200 |
pipah |
Beurat |
||
|
Φ300 |
pipah |
Konsentrasi Reducer |
Cahaya |
||
|
Φ400 |
pipah |
Beurat |
|||
|
Φ500 |
pipah |
Konektor sedengkeun |
315(450)*75 |
pipah |
|
|
Φ600 |
pipah |
315(450)*110 |
pipah |
||
|
Ditabungkeun Pipe |
200*200 |
pipah |
315(450.630.700)*160 |
pipah |
|
|
300*315 |
pipah |
315*200 |
pipah |
||
|
400*400 |
pipah |
450*200 |
pipah |
||
|
500*500 |
pipah |
630*200 |
pipah |
||
|
Coril |
300*500 |
pipah |
630*300 |
pipah |
|
|
450*750 |
pipah |
700*110 |
pipah |
||
|
TIPRESS PRIVE |
20cm * 2.0 |
gulung |
700*200 |
pipah |
|
|
30cm * 2.0 |
gulung |
700*300 |
pipah |
Fisik - mangrupikeun sipat komposis
|
Barang |
Kaayaan |
Standar |
||
|
Tembok struktural témbok aliran anu saé pisan |
Kaku heuras (kne / m3) |
J1,L1 |
Langkung ageung atanapi sami sareng 4 |
|
|
J2,L2 |
Langkung ageung atanapi sami sareng 6,3 |
|||
|
J3,L3 |
Langkung ageung atanapi sami sareng 8 |
|||
|
Secrési lingkungan |
Dina kaayaan 30% komprési |
Teu dicabut, teu aya sangka reting |
||
|
Tés dampak |
20 gelar 20 ± 2 gelar, 1kg beurat, D90 Lanjut, 2,5m |
Teu bérés atanapi karusakan |
||
|
Kakuatan weld / n |
D600,D700,D800 |
Langkung ageung atanapi sami sareng 760 |
||
|
D langkung ageung tibatan atanapi sami sareng 1000 |
Langkung ageung atanapi sami sareng 1020 |
|||
|
Tés ogé |
Ujian tekanan axial |
J1, Tekan Tés L1 langkung ageung atanapi sami sareng Reck J2, tekanan tés L2 langkung ageung atanapi sami sareng 40kn J3, sami sareng 60ner |
Saatos sékrési tekanan, henteu beubeulahan, rengkuh, atanapi deformasi |
|
|
Tés tekanan gurat |
Tekanan tés B1 langkung ageung tibatan atanapi sami sareng tekanan uji 10k |
Saatos sékrési tekanan, henteu beubeulahan, rengkuh, atanapi deformasi |
||
|
Tés dampak |
20 gelar 20 ± 2 gelar, 1kg beurat, D90 Lanjut, 2,5m |
Teu aya beubeulahan atanapi retakan |
||
|
Ujian tekanan axial |
Tekanan tés B1 langkung ageung tibatan atanapi sami sareng Stref Tr2 Tekan Hill langkung ageung tibatan atanapi sami sareng Tekan Tekan Tekan Bo langkung ageung tibatan 40n |
Saatos sékrési tekanan, henteu beubeulahan, rengkuh, atanapi deformasi |
||
|
Tés nyukur |
Diaméter pipa DN / mm pikeun sambungan ku pipa |
Beban f / kn |
Teu aya beubeulahan atanapi retakan |
|
|
400 |
4 |
|||
|
50 |
6 |
|||
|
630 |
10 |
|||
|
710 |
10 |
|||
|
800 |
10 |
|||
|
1000 |
12 |
|||
|
Tés bocor |
Tingkat cai ngahontal jangkungna pamariksaan ogé dibuka, henteu aya bocor dina awak |
|||
Ciri sampel
Sajumlah uncu - nyegah clogs, ngagambarkeun aliran gancang.
Hampang & adaptasi - ngahemat waktos sareng kuli.
Biaya - Épéktip - pamasangan langkung gancang, biaya handap.
Sambungan
Proyék pamutahiran cai & devurs
Téknik Municipal
Irigasi tunduk & sistem plinkler
Saluran urban
panas Tags: plastik Hashole Hdpe, céri utama Manhole HDPE, suplemén, pabrik
